VKG ENERGIJA OU

Object: VKG ENERGIJA OU Severnaja Thermal Power Plant

2014

Estonia, Kohtla-Jarve

Assignment: Turnkey construction.

Condensate purification 80 m³/h;

Sorption 80 m³/h;

Mixed bed filters  80 m³/h;

Demineralization 40 m³/h;

Ultrafiltration 55 m³/h;

Reverse osmosis 47 m³/h;

Electrodeionisation unit 40 m³/h.

Nowadays Technologies supplied:

36 Pressure Vessels, length: 6m (8 x 40 inches) for RO systems.