Lithuanian Power Plant (JSC „Lietuvos energijos gamyba“)

Object: Lietuvos Energija: Lithuanian Power Plant

2015

Lithuania, Elektrenai

Assignment: Turnkey construction. Water treatment for boiler feed

Ultrafiltration 4×25 m³/h;

Reverse osmosis 1st stage 4×25 m³/h;

Reverse osmosis 2nd stage 4×25 m³/h;

Electrodeionisation 4×25 m³/h;

Na+ cation exchange 20 m³/h;

Sorption filters 2×50 m³/h;

Mix bed filters 2×50 m³/h.

Nowadays Technologies supplied:

48 Pressure Vessels, length: 5m (8 x 40 inches) for RO systems.