VKG ENERGIJA OU
Object: VKG ENERGIJA OU Severnaja Thermal Power Plant
2014
Estonia, Kohtla-Jarve
Assignment: Turnkey construction.
Condensate purification 80 m³/h;
Sorption 80 m³/h;
Mixed bed filters 80 m³/h;
Demineralization 40 m³/h;
Ultrafiltration 55 m³/h;
Reverse osmosis 47 m³/h;
Electrodeionisation unit 40 m³/h.
Nowadays Technologies supplied:
36 Pressure Vessels, length: 6m (8 x 40 inches) for RO systems.
Read more